October 19th, 2012
How to Be Energy Efficient at Home: It’s Not What You Do, But …
It’s not just which energy efficiency projects you implement at home that will make a dent in your bills — it’s how many.
HouseLogic: Yesterday you told us why we’re so disconnected from our home’s energy use. Today, tell us what we should be doing differently to make our homes more energy efficient.
Suzanne Shelton: First, I want to mention that it matters how many energy-efficient things you do. Half of the population say they’ve done two to three things to make their homes more energy efficient — replaced incandescent lightbulbs with CFLs, bought an Energy Star appliance, added insulation— but most people report that their bills have gone up.
HL: So more projects equal more results?
SS: Right. Once you get up to the level of making four or five energy-efficiency home improvements, you generally start seeing savings on your utility bill.
Depending on the activities you choose and the point you’re starting out at, you can probably expect a four- or five-year time frame for return of your investment. Which means now is a great time to do it. How many of us are stuck in our homes now because of the market?If you’re potentially four or five years from selling, why not go ahead and make those improvements? You’ll get yourself paid back and live more comfortably and frugally right now, and you can brag about your improvements when you sell your house.
HL: The economy is weighing on everyone. If a home owner has just $1,000 to spend on energy-efficient home improvements, what would you recommend he or she do first?
SS: 5 things:
1.Caulk and seal all penetrations into the home. I’ll tell you, I had a home energy audit done three years ago, and even though I do this for a living, I was astonished. When the guy walked me down into my basement and showed me all the penetrations from plumbing lines and electricity wires, I couldn’t believe all the gaping holes in my house. Buy a few cans of Great Stuff and take a weekend to go around and seal everything, filling around windows, too. It takes time and it’s a pain, but it works.
2. Hire an HVAC contractor to take a hard look at all your ductwork — are there any ducts leaking that need to be re-sealed? — and give you an HVAC tune-up. You might spend a couple hundred bucks, but you can save significantly depending on how old or out of shape your HVAC system is.
3. Replace all your lighting with CFLs or LEDs. Most people tell us they’ve replaced all their incandescents, but it just isn’t true. The DOE says that only about 13% of sockets are filled with CFLs right now.
4. Program your thermostat. Most people who buy programmable thermostats don’t program them. If we actually programmed them not to heat the furniture while we’re away, that would be smart.
5. Reduce the temperature on your water heater. The Department of Energy recommends 120 degrees. If you have a tank water heater, it keeps a certain amount of water hot and ready to go all day, so lowering the temperature reduces the energy you use to heat the water.
If, after you’ve done all those relatively low-cost things, you want to make a little bit more of an investment, consider adding insulation to your house.
No one wants to do these things because they’re not sexy, and they’re kind of a pain, and windows seem more appealing. But I’d do all these activities before I replaced my windows.
HL: If you could spearhead an ad campaign to motivate home owners to make more energy-efficient improvements, what would it say?
SS: You have to do five things to see the savings you want. That’s actually something we’re working on right now, so stay tuned.
Which energy-efficient projects have you implemented? Have you seen a reduction in your bill or an increase?
Information that is being provide is for Educational Purpose, Any electric work that is needing to be done, should be done by a Licensed Electrician.
Category:
Educational Purpose| No Comments »
October 17th, 2012
Furnaces 101
Furnaces fueled by natural gas are by far the most common heating system for homes in the United States. Newer models are very efficient. They tend to last 20 years on average, but they do require annual inspections and some basic maintenance to function safely and well.
How a Furnace Works
Furnaces heat your home by circulating heated air through a series of ducts. That air is heated by the burning of fuel within the furnace. Furnaces can be fueled by natural gas, oil, and even propane, but natural gas is the most prevalent. As the fuel burns, the hot gases that are generated move through curved metal tubing called a heat exchanger, and then exit your home through a vent pipe. Simultaneously, the air circulating through your ducts passes over the exterior of the heat exchanger, and gathers heat from the hot metal. That warmed air is then circulated throughout your house. The heat exchanger keeps the combustion air and the supply air separate, ensuring that the air in your home is heated without risking exposure to the toxic gases that are the by-products of combustion.
Furnaces can vary widely in efficiency. That efficiency is measured by the furnace’s annual fuel efficiency, or AFUE rating. This number calculates the percentage of energy that is returned to your home as warm air.
Standard Furnaces have an average AFUE rating of 80-85%. This means that 80-85% of every dollar you spend on heating energy is returned to your home as warmed air. Standard furnaces have only one heat exchanger to collect the heat produced by the gas burner. An AFUE rating of 80% means that 20% of your energy is lost as water vapor that’s exhausted outdoors through the flue pipe.
High-Efficiency Furnaces go one step further, and use a secondary heat exchanger to evaporate the water vapor a second time, to extract even more available heat. High-efficiency furnaces can have ratings as high as 96 AFUE, which translates to an energy loss of only 4%. High-efficiency furnaces are rapidly becoming the standard as the preferred choice for new construction and as older furnaces fail and are replaced by newer models.
Older Furnaces, or gravity-flow models, functioned without a blower fan, and had efficiencies of as little as 30%. These are no longer manufactured, but there are still some in use. If you have one, you’d be well advised to replace it. Newer models are vastly more efficient, and offer energy-saving features such as electronic pilot light ignitions, sealed combustion units, and vent dampers. They’re far safer as well.
How They Wear Out
Most furnace deaths are due to cracked heat exchangers. Cracks can occur over time due to expansion and contraction, as the burners turn on and off to regulate the heat in your home. That expansion and contraction eventually fatigues the metal to the point where it cracks. This is a serious issue, as even a small crack can allow for deadly carbon monoxide gas to enter your home.
Maintenance and Safety
Every year, hire a licensed professional to test your furnace and conduct an inspection to check for wear, damage, and possible carbon monoxide leaks, as well as to lubricate parts and ensure that safety mechanisms operate properly. Annual tune-ups typically run anywhere from $50-100, but they can reduce your heating costs by as much as 5%, and more importantly, help guard your family against exposure to deadly carbon monoxide gas.
In addition, here are some steps you can take to help ensure your safety, keep your furnace healthy and efficient, and save you money along the way.
Change your filters once a month, or clean your reusable filters every other month. A dirty filter decreases the airflow and prevents the system from working efficiently, results in higher heating bills, and can cause possible damage to the motor. More than half of furnace service calls are caused by ordinary dust and dirt clogging up vital components.
Purchase and install a carbon monoxide alarm near your furnace, or better yet, in several locations around your house. Carbon monoxide gas is odorless and colorless, so you can’t detect its presence on your own. If you already have a carbon monoxide alarm, and it is more than 5 years old, replace your existing alarm with a new, improved model. The Consumer Product Safety Commission, in cooperation with Underwriter’s Laboratories, has advanced the standard for reliability of these detectors since 1999.
Install a programmable thermostat. By automating your heating system, you can set it and forget it for long periods, and help save energy by not heating your home when you’re away.
Check your interior heating vents to ensure that they are not obstructed in any way. You’ll promote more even heat flow throughout the house, and save energy.
Don’t forget the outdoor exhaust vents. In winter, keep snow and ice away from the outdoor intake and exhaust vents. If those vents become blocked, dangerous carbon monoxide fumes can back up into the house, and the furnace could shut down.
A Word About Filters
Not all filters are created equal. When selecting your filters, you may be tempted to buy the least expensive one to save some money. If you have allergies, asthma, or other respiratory ailments, you’ll be much better off purchasing a higher quality filter.
Here are the three common types of furnace filter.
- Disposable fiberglass filters are certainly the cheapest, but they’re also the least effective. They block only the largest particulates to protect your furnace. Smaller particles, like pollen and mold, sail right through, and can make sensitive individuals miserable.
- Washable electrostatic filters contain a static charge that attracts dust, dirt, and other matter. These filters are more effective than disposable models, but still screen out only 15-20% of airborne particles. They can also be a chore to clean.
- Pleated filters use a more dense mesh material to trap particles, further enhanced by a pleated design to increase the surface area. This helps eliminate large allergens like pollen and mold and more than doubles the efficiency of cheaper models. While they are more expensive per filter, they are designed to last 3 times longer, so you can replace them less often.
Keep the Home Fires Burning
If you do the little things and dutifully look after your furnace, you can prolong its life span, and keep your energy bills low. More importantly, you help ensure your family’s safety, and that thought should warm your heart like no furnace can.
Source: Living With My Home
Information that is being provide is for Educational Purpose, Any electric work that is needing to be done, should be done by a Licensed Electrician.
Category:
Educational Purpose| No Comments »
October 16th, 2012
UNGROUNDED (2-PRONG) RECEPTACLES
Illustration: Ian Warpole
PROBLEM #9
Undergrounded (2-pronged) receptacles means your home has no way to safely conduct stray current
What it means: Your house’s wiring has no way to safely conduct any stray current that escapes the confines of the wires.
Code violation? No; grandfathered in. (Today’s code requires grounded circuits and receptacles.)
Danger level: Minimal, as long as you don’t use an adapter to fit a three-prong plug into a two-prong receptacle. Doing so could destroy the device you’re plugging in, and increase the chance of electrocution.
Solution: Replace two-prong receptacles with properly grounded three-prong ones, if wiring allows it (see . Also, test all existing three-prong receptacles with a GFCI circuit tester to make sure they’re grounded. Rewire any that aren’t.
Information that is being provide is for Educational Purpose, Any electric work that is needing to be done, should be done by a Licensed Electrician.
Source: This Old House
Category:
Educational Purpose| No Comments »
September 26th, 2012
Appliances & Electronics
Be Power Smart and buy energy efficient appliances. The ENERGY STAR symbol (open new window) identifies models that ensure that they are among the most energy efficient in their class and do not compromise performance. ENERGY STAR appliances are 10 to 50 per cent more efficient than conventional models. When you buy an appliance there are actually two “price tags”:
- the cost of the appliance;
- the cost of operating the appliance during its lifetime; consider this “second price tag” when purchasing your appliances.
Electronics such as DVD players, televisions, alarm clocks, and cell phone chargers use power even when they are not being used. The continuous use of electricity is called standby power.
ENERGY STAR electronics reduce standby power and are more efficient than standard electronics.
For more information on energy efficient electronics, visit the Natural Resources Canada website (open new window).
Source : Manitoba Hydro
Category:
Educational Purpose| No Comments »
September 26th, 2012
Top Electrical Projects Best Left to a Professional
Electricity plays an important role in your home, running the heat and appliances among other things. There are plenty of repairs and other projects that will pop up and need immediate attention. While you may be able to handle small things like changing a light fixture or wiring in a phone jack, there are certain electrical projects that should only be handled by a trained professional.
Changing Out the Wire
Older aluminum wiring will need to be changed out to the modern (and much safer) copper wiring. This is an extensive job that requires hours of work and major lengths of wire. Not only is copper more resistant to corrosion, it is more flexible and adaptable in a variety of configurations and provides a much more reliable connection between the panel board and your outlets and fixtures.
In most cases house wiring needs to be done by a licensed electrician. In certain circumstances a homeowner is allowed to do the wiring in their own home, provided that all electrical safety codes are followed, a permit is applied for and regular inspections take place. But just because something is allowed does not mean it is recommended.
Whether you are replacing an aged wiring system or completing a basement renovation, this size of project needs to be handled by a professional.
Putting In a New Panel
Wiring is not the only thing that needs to be upgraded. Often the fuse panels that were used in older homes need to be replaced with breaker types. These newer panels eliminate the problem of overfusing (putting in a fuse that is too large for your wiring to handle) and cut down on maintenance. Breakers that flip as opposed to fuses that blow are much easier to maintain.
A professional electrician should always handle any work done on your panel. This is the connection between your home and the main service and any changes done here will affect the balance of your house power. Have a pro handle the panel to provide the safest electrical system throughout your home.
Appliance Repair
Not only does this void any warranty that applies, but attempting to fix your appliances can end up costing you much more than a visit from the repairman will. You may be tempted to pop open your refrigerator or dishwasher when there’s a problem, but one or two small mistakes inside can cause major issues with these often complex units.
If you know that a small replacement part will fix the problem, by all means give it a try, but for diagnosis and other more complicated work, an experienced repair technician or electrician is your best bet. Keep your appliances running well by having them maintained by those who are in the know.
Electrical repairs and projects are a common occurrence in the home. Although the services of a pro will cost you money, in many cases this is a safer and necessary choice. When upgrading your wiring or electrical panel a licensed electrician is the professional to call in. If your appliance is in need of repair, ask a technician to help you out. That way you can better rely on the performance and safety of the electrical system in your house.
Source : Handy Canadian
Information that is being provide is for Educational Purpose, Any electric work that is needing to be done, should be done by a Licensed Electrician.
Category:
Educational Purpose| No Comments »
September 14th, 2012
Illustration: Ian Warpole
PROBLEM #8 – Backstabbed wires are more likely to come loose
8. BACKSTABBED WIRES
What it means: On newer switches and receptacles, wires pushed in the back are more likely to come loose than those anchored around screw terminals.
Code violation? No. The practice is allowed, even for new construction.
Danger level: It depends. At a minimum, loose wires can cause a receptacle or switch to stop working. In the worst case, they can start a fire.
Solution: Check for back-stabbed connections by removing a switch or receptacle from its outlet box. If one is back-stabbed, there are likely to be more. Release the wires and attach them to the appropriate screw terminals on the receptacle.
Information that is being provide is for Educational Purpose, Any electric work that is needing to be done, should be done by a Licensed Electrician.
Source:This Old House
Category:
Educational Purpose| No Comments »
September 14th, 2012
8 Things to Consider Before Starting an Electrical Project
Any electric work that is needing to be done, should be done by a Licensed Electrician.

Your home is full of electrical projects both big and small. With more and more technology in our homes the need for electricity and electrical upgrades keeps climbing.
But these projects require careful planning, good safety practices and the ability to work within your existing system.
1) Know Your Own Grid
It’s important that you have an idea about the services available in your home. Are you working with a breaker panel or a fuse box? How are the rooms and appliances wired? Much of this information can be gathered through simple tests of your breakers/fuses or by having an electrician in to inspect your home.
2) Consider Labeling Everything
This is a trick that will save you plenty of hassle for the rest of the time you live in your home. Label the breakers/fuses, label the wires if you can get at them and even label the major switches in utility rooms and outside the house. Don’t trust your memory or rely on a sketch filed away.
3) Understand the Basic Electrical Codes
Get a copy of the household electrical code for your region and read it through. This will give you an idea of the loads and limits allowed and should guide you through the basics of wiring, switch replacement and lighting installation.
4) Read the Installation Instructions Thoroughly
When you are installing or replacing a light fixture, built in appliance, switch or outlet be sure to read through all of the instructions that came with the product. Pick up a good DIY electrical manual to help you complete the project safely and efficiently.
5) Always Turn Off the Power
When working with electricity, always turn off the main power before you start. Don’t take any chances. Use battery powered flashlights or flood lights to illuminate your work area if necessary and be sure the power has been switched completely off.
6) Think About the Condition of the Materials
You may be tempted to reuse old wiring, switches and components to save money and time shopping for new material. Although it is possible to do at times, you can never be certain of the quality unless you have picked up the material yourself. Electrical supplies are not generally expensive and it’s a good idea to start each project with unused materials.
7) Work Through Your Lighting Needs
For additions, renovations and redecorating, you will usually be adding new light fixtures. Sit in the room and get an idea of what type of lighting you’ll need, where it should come from and where the switches should be. Consider traffic flow, the activities being done in the room and future use.
8) Get a Permit
Many regions require that homeowners get an electrical permit when they are adding a new panel, replacing the wiring or any other major electrical work. It will be an added cost and usually requires inspections, but this step will protect you and make your insurance company happy.
Always be careful when taking on electrical home improvements. Even skilled professionals practice safety while doing their job and always leave their work site neat and tidy. Plan well, do your homework and work carefully. Your electrical project will go much smoother and result in a brighter, more powerful result.
Handy Canadian Inc does not warrant the accuracy, completeness, safety, legality or usefulness of any Content.
Source : Handy Canadian
Information that is being provide is for Educational Purpose, Any electric work that is needing to be done, should be done by a Licensed Electrician.
Category:
Educational Purpose| No Comments »
August 31st, 2012
Sample Renovation Contract
Introduction
A detailed written contract between you and the contractor you hire is essential to any renovation or home repair project, no matter its size. Even the smallest job should be put in writing.
Why? To begin with, a written contract constitutes a binding legal agreement between you and your contractor. It spells out the responsibilities and rights of both parties and ensures there is a clear record of the agreement between you and the contractor.
A proper contract also reduces your risk. It helps safeguard you from financial loss or personal liability in case of accidents or injuries during the project.
Finally, a contract establishes the foundation for a good working relationship between you and your contractor. A detailed and clearly written contract reduces confusion and misunderstandings, and helps you both see the work the same way.
Should you feel awkward about asking for a contract? Absolutely not! Professional contractors run a business and know that a written contract is an indispensable part of good business practices. It protects them as well as their customers.
But what if a contractor suggests that you go ahead without a contract, or won’t put anything on paper? Don’t do it! The risks are simply too high.
The following sample renovation contract presents some of the terms and conditions that could be used in a written contract for home renovations and repairs. It is presented for illustrative purposes only to demonstrate what a contract can cover and why such content would be included. Project elements, site-specific details and other factors affecting your renovation may vary. The statements, terms and conditions contained in the sample contract may not be suitable for your particular circumstances.
CMHC assumes no responsibility for any consequences arising from your use of this sample contract or from your reliance upon it. The actual form of contract presented to you by the contractor you hire may differ significantly from this sample contract. It is recommended that you consult appropriate professional resources and seek legal opinion before you sign any contract.
Renovation Contract
Contractor (name of company) ______________________________
Address _______________________________________________
______________________________________________________
Project manager _________________________________________
Telephone __________ Fax ___________ E-mail _______________
Business Number ________________________________________
Municipal Business License #, if applicable _____________________
Owner(s) ______________________________________________
Address _______________________________________________
Telephone __ _______Fax ___________ E-mail ________________
Project address (if different from above)________________________
1. Contract Documents
(a) This Contract form
(b) Drawings attached and/or referenced herein (if any)
______________________________________________________
______________________________________________________
(c) Specifications attached and/or referenced herein (if any)
______________________________________________________
______________________________________________________
(d) Additional documents signed by both parties during the course of this Contract. Extras and deletions to be documented on a Change Order Form and signed by both parties.
______________________________________________________
______________________________________________________
(e) Other
______________________________________________________
______________________________________________________
Omissions in the Contract Documents and any work requested in variance to the Contract Documents are considered extra to the Contract and are not included in the Contract Price. Any additional work, required due to site conditions known to the Owner and not disclosed to the Contractor, or which could not be reasonably anticipated by the Contractor, are not included in the Contract Price and shall be extra to the Contract Price.
2. Description of Work
Unless otherwise stated, the Contractor agrees to supply all materials, labour and supervision to perform the Work as (choose one):
______ Described below
______ Described in the attached Work Schedule
a. The Work entails the following _____________________________
______________________________________________________
______________________________________________________
______________________________________________________ |
b. The Work does NOT include the following
______________________________________________________
______________________________________________________
______________________________________________________
______________________________________________________
______________________________________________________
______________________________________________________
c. Permits
Work will be undertaken under the following permits which will be provided and paid for by the Owner or the Contractor as designated below.
|
Owner |
Contractor |
(i) Zoning variance |
_______ |
_______ |
(ii) Demolition permit |
_______ |
_______ |
(iii) Building permit |
_______ |
_______ |
(iv) Electrical permit |
_______ |
_______ |
(v) Plumbing permit |
_______ |
_______ |
(vi) Other |
_______ |
_______ |
Any such permit obtained by the Contractor will be conveyed to the Owner within ___ days of receipt by the Contractor.
The following parties (specify Contractor or Owner) will contact the appropriate authorities for inspections: ______________________________________________________
______________________________________________________
d. Subtrades
The Contractor will use the following subtrades during the performance of the Work as listed below (company name and service provided): ______________________________________________________
______________________________________________________
______________________________________________________
______________________________________________________
If any subtrade listed above subsequently becomes unavailable for the Work, the Contractor will provide a suitable replacement, for Owner’s approval prior to the subtrade commencing work.
Nothing contained in the Contract Documents is intended to, nor shall it, create any contractual relation between the Owner and any subtrade. The Contractor agrees that it is responsible for the enforcement of all material provisions of all subcontracts.
3. Timing
Work to commence on or before (date) ________________________
Substantial Completion on or before (date) ______________________
Full Completion on or before (date) ___________________________
Substantial Completion means that the Work has been completed to such a percentage completion as is specified for substantial completion or substantial performance of such Work in the applicable legislation of the province where the Project is situated, that the Work has been completed to the point where it is ready for use for the intended purpose, and that an occupancy permit, where required, has been issued. |
All time limits stated in this Contract are of the essence. Notwithstanding the foregoing, any delay in Substantial Completion or Full Completion of the Work (as the case may be) in accordance with the Contract Documents will be considered an excusable delay if arising from causes beyond the Contractor’s control and not reasonably foreseeable by the Contractor with the use of the Contractor’s best professional efforts. Excusable delays include but are not limited to such events as labour disputes, unavailability of materials, delays in obtaining a permit, fire, natural disaster, unfavourable weather conditions, delays (other than delays arising out of Contractor’s breach of this Contract) by, or breach by any subtrades; or any delay by Owner of processing proposed changes, delays resulting from inaccuracies in information provided by the Owner, or delays resulting from the performance of tasks described in section 2b.In the event of the occurrence of an excusable delay, Owner shall grant appropriate extensions to cover such periods of delays. Owner shall have no obligation to grant extensions if delays were not excusable delays, or otherwise resulted, directly or indirectly, from the Contractor’s breach of this Contract. Where a delay occurs, the Contractor must inform the Owner at the earliest possible date of such occurrence, the reason for the delay and anticipated amended dates of completion.The Contractor and Owner agree that should the Contractor not be able to commence the Work within ___ days from the commencement date specified in this Section, due to causes beyond the Contractor’s control such as inability to obtain a building permit, then the Contractor or the Owner may cancel the Contract on written notice mailed to or delivered to the address of the other party shown in this Contract. The Contractor’s liability to the Owner shall be limited to the refund of any monies paid by the Owner to the Contractor, less any cost incurred by the Contractor as previously agreed to by the Owner as specified below.______________________________________________________
______________________________________________________
______________________________________________________
______________________________________________________
______________________________________________________
______________________________________________________
______________________________________________________
______________________________________________________
4. Terms of Payment
The Contract price is to be calculated as follows (select one):(a) Stipulated fixed cost basis (all inclusive) $__________________, plus GST/HST Payments shall be due and payable as outlined in the Payment Schedule.
(b) Cost plus ______________% of cost, plus GST/HST Payments shall be due on a bi-weekly _______ or monthly ________ basis (check one).
(c) Cost plus fixed fee of $_______________________, plus GST/HST
Payment shall be due and payable as outlined in the Payment Schedule. A percentage of the fixed fee shall be paid on the presentation of each billing and shall be proportionate to the percentage of work completed for that billing period. |
5. Payment Schedule
The Owner will make payments to the Contractor, minus a ___% holdback as required by provincial construction lien legislation, as follows:
|
Gross |
Payment |
Holdback |
Signing of Contract |
$________ |
$________ |
$________ |
|
|
|
|
Start-up of Work |
_____ |
_____ |
_____ |
Upon completion of
___________ |
_____ |
_____ |
_____ |
Upon completion of
____________ |
_____ |
_____ |
_____ |
Upon completion of
____________ |
_____ |
_____ |
_____ |
|
|
|
|
Substantial Completion |
_____ |
_____ |
_____ |
Full Completion |
_____ |
_____ |
_____ |
|
|
|
|
___% Holdback for
___ days
after completion |
_____ |
_____ |
_____ |
|
|
|
|
TOTAL |
_____ |
_____ |
_____ |
Payment is due within ___ days of invoicing. Interest of ___% per annum, or the maximum rate allowable by law, whichever is less, will be charged on unpaid invoices after the due date.
All payments are subject to applicable legislation and shall be made in accordance with provisions of this Contract and the provisions of any applicable legislation. All payments must be made to the Contractor. Any payment to a subcontractor is not deemed a payment to the Contractor.
6. Changes in Work
The Owner may make changes by altering, adding to, or deducting from the Work, with the Contract and Contract Price being adjusted accordingly. Changes to the Work require a written Change Order Form, signed by both the Owner and the Contractor.
a) Extras will be calculated in the following manner (check one):
1) ___ Material cost plus hourly rate of $ ___
2) ___ Labour and material cost plus ____%
3) ___ A lump sum to be agreed on in advance by both parties.
Extras are payable upon (check one):
1) ___ Signing the Change Order
2) ___ Invoicing pursuant to the Change Order
3) ___ Completion of work specified in Change Order less___% holdback in all cases.
b) Deletions will be calculated on a cost less ___% basis, to be deducted from the relevant or next scheduled payment.
7. Utilities and Washroom Facilities
The Contractor and the Owner agree that responsibility for the provision of utilities and facilities to meet work and worker requirements will be assumed in the following manner:
|
Owner |
Contractor |
(a) Water |
_____ |
_____ |
(b) Electricity |
_____ |
_____ |
(c) Washroom |
_____ |
_____ |
(d) Other
________________ |
_____ |
_____ |
|
8. Standards of Work
The Contractor agrees to supply all labour, materials and supervision to complete the Work in accordance with the Contract Documents.The Contractor agrees to undertake all Work diligently in a good and workmanlike manner, in accordance with good quality residential standards and practices, and in compliance with any applicable Building Code and all other authorities having jurisdiction.The Owner accepts that there may be inconveniences from time to time, and the Contractor agrees to keep such inconveniences to a reasonable minimum. It is the responsibility of the Owner to take reasonable steps to provide a work area free of household obstructions, and to remove or protect household items in areas where it may be reasonably anticipated by the Owner that they may be subject to dust, damage or vibrations.The Contractor agrees to keep the site orderly and reasonably free of debris. At the completion of the project, the Contractor shall clean the property and leave it fit for use. All equipment, materials, rubbish and similar material incidental to the project shall be removed by the Contractor.9. Warranty
The Contractor shall correct, at its’ own expense, any defects in the Work due to faulty materials and/or workmanship pursuant to this Contract for a period of ___ year(s) from the date of Full Completion.
The Owner shall give the Contractor written notice of such defects within a reasonable time, and in any event within the warranty period.
Special conditions limiting/affecting this warranty (if any)
______________________________________________________
______________________________________________________
______________________________________________________
The Contractor will convey to Owner any warranties by manufacturers or suppliers on individual materials, products or systems supplied by Contractor under this Contract.
The Contractor does not warrant labour and/or materials supplied by the Owner or the Owner’s subcontractors. The Contractor shall protect the Work, the Owner’s property and the property of third parties from damage occasioned by the performance of its obligations under the Contract Documents.
10. Insurance
Prior to commencing the Work, the Contractor agrees to provide, maintain and pay for insurance during the time the Work is being performed, including commercial general liability in the minimum amount of $1,000,000 against claims for damages for personal injury or property damage by reason of anything done or not done by the Contractor, its employees or agents, in connection with the performance of this Contract. The Contractor will also provide proof of automobile liability insurance. The Contractor is responsible for all materials on site provided by the Contractor for the Work in this Contract until installed.
11. Compliance with Workers’ Compensation and Other Laws
The Contractor agrees to provide evidence of compliance by the Contractor’s own company and any of the Contractor’s subcontractors with all requirements for registration and payments due under the province’s workers’ compensation statute.
The Contractor also agrees to comply with all laws, ordinances, rules, regulations, codes and orders in force during the performance of the Contract which relate to the preservation of public health or construction safety. |
12. Other Contractors
Owner reserves the right to let separate contracts in connection with the Work or to do certain work by Owner’s own forces as specified in Description of Work.The Contractor shall include in his work co-ordination with Owner’s separate contractors or forces, and Owner shall pay the Contractor $ __________ for coordination of same.13. Dispute Resolution
The Owner and the Contractor agree that in the event of a dispute as to the interpretation of this Contract or the extent of the Work, the issues shall be submitted to arbitration as agreed to by both parties or under the province’s arbitration statute.14. Default by Owner
In the event that (a) the Owner does not perform its obligations under this Contract in accordance with the terms of this Contract and has not corrected the default within ___ days of written notice by the Contractor, or (b) the Owner becomes bankrupt or makes a general assignment for the benefit of its creditors, or if a receiver of the Owner is appointed, or (c) if the Work is stopped as a result of a court order, then the Contractor may cease work and treat the contract as repudiated forthwith on the occurrence of such default. In such event, an accounting shall be made between the Owner and the Contractor, and the Contractor shall be entitled to payment for such parts of the Work as are completed at the time of default.15. Default by Contractor
In the event that (a) the Contractor does not perform the Work in accordance with the terms of this Contract and has not corrected the default within ___ days of written notice by the Owner, or (b) the Contractor becomes bankrupt or makes a general assignment for the benefit of its creditors, or if a receiver of the Contractor is appointed, then the Owner may finish the Work in accordance with the plans and specifications as the Owner may deem expedient, but without undue delay or expense.
In such event, the Contractor shall not be entitled to any further payment under this Contract, but upon completion of the Work, an accounting shall be made between the Owner and the Contractor. If the unpaid balance on the Contract Price shall exceed the expense of finishing the Work, the Owner shall pay the Contractor for such parts of the work as were payable or completed at the time of the default. However, if such expense shall exceed such unpaid balance, the Contractor shall pay the difference to the Owner.
16. Signs
The Owner agrees to permit the Contractor to display a sign on the project site until completion.
This Contract shall not be assigned, in whole or in part, without the prior written consent of the other party, which consent will not be unreasonably withheld or delayed.
This Contract shall be governed by and construed under the laws of the Province in which the project is situated, and supercedes all prior communications and agreements. There are no other terms outside of this Contract.
The Contractor assures that there is not now any claim, action, contract, rule or other circumstance which may interfere with the Contractor’s ability to perform its obligations under this contract.
________________ |
________________ |
________________ |
Owner |
Date |
Witness |
________________ |
________________ |
________________ |
Owner |
Date |
Witness |
________________ |
________________ |
________________ |
Contractor |
Date |
Witness |
|
Commentaries
Parties to the Contract
Renovation companies range from one-person operations to sizeable outfits with salespeople, admin-istrative staff and on-site personnel. The contract is between you and the company, and should specify the key individual from the company who will be performing or managing the work and be your primary contact.
A Business Number is required for all businesses that are registered for GST/HST. By comparison, only a few municipalities across the country require a business license. A few provinces also require renovation contractors to be bonded. If in doubt, contact the appropriate authority for clarification.
1 — Contract Documents
For small projects, this contract form alone may be similar to the full contract between you and your contractor. Larger projects may require additional documents, such as drawings and plans which should be attached and become part of the contract.
Specifications describe the materials and products that will be used in the work. Specifications should be detailed and include as appropriate: brand name, dimensions, model, product number, colour (number and/or specific name), performance characteristics and so on. On a small job using few different products, specifications may be written directly into the Description of Work on the contract form.
2 — Description of Work
The key word for this section is detail. It should give a thorough description of the work and what is to be done, step by step. That way, nothing is left to chance or left out by mistake, and both you and your contractor have a clear understanding of what the work entails. Typically, some of the things that should be listed are:
- preparatory work (e.g. tearing down walls, removing old shingles);
- items to be salvaged for reuse (e.g. bathroom fixtures, moulding);
- waste disposal (e.g. hauling to landfill site; special treatment of classified or hazardous wastes);
- structural details (e.g. framing, sheathing, insulation, sub-floors, ductwork, hook-up for plumbing and electrical services);
- brand-name, style and other product information (e.g. furnace, windows, fixtures, siding, roofing) — can refer to specification list, if any;
- size and location (e.g. windows, doors, closets) — can refer to drawings, if any;
- finishing work (e.g. number of coats of paint & stain).
Any work the contractor will not be responsible for must also be noted, for instance, landscaping or laying carpeting. Also, will you provide some of the materials yourself? Will you be doing some of the work yourself? Or hire others to do it? This should be specified in the description of work.
The contractor should be able to tell you what permits are required for your renovation. It is normal practice for the contractor to get the permits required for the work for their clients, but responsibility for obtaining permits and requesting inspections should be specified in the contract. Be aware though, that responsibility for complying with prevailing permit requirements ultimately rests with the owner of a property. If you have any questions, call your municipality. Also find out if a security deposit is needed to cover any damage and repair to municipal property or utilities resulting from your work.
A zoning variance may be needed for a number of reasons (e.g. if you want to extend the existing building beyond the set-back allowances on the property or add a second story to your home). Getting a variance can be a lengthy process that includes the formal notification and approval of neighbours.
A thorough description of work can run several pages in length and can be attached to the contract as a separate document, to be signed by both parties. One way to decide if the description is detailed enough is to think of it as a set of instructions. Would two people using this description end up with the same result, or are there gaps in the information or a need for clarification?
3 — Timing
The dates represent the contractor’s best estimate of when work can begin and how long it will take to complete. For longer projects, or those involving distinct stages, the contractor might estimate completion dates for each stage.
The contractor should schedule the work carefully to ensure an efficient and logical progression. This is particularly critical if a number of subcontractors are involved and must be slotted in at the right time. The schedule also needs to consider any work that you want to undertake yourself or hire others directly to do, when and if this work has a direct bearing on the contractor’s work. For instance, if you wish to look after plumbing or wiring yourself, the schedule should allow a reasonable time for this task. At the same time, you need to make sure that this job is done within the given time, or the contractor may not be able to complete your project on schedule.
If you want to make any changes once work is underway, you should speak directly with the contractor or the appointed project manager, not the subcontractors or workers on site.
Discuss the work schedule with the contractor. If there are certain hours or days when you don’t want work to take place, the contractor needs to plan around these restrictions. These times and dates should be specified in the contract.
In the event of cancellation of the contract prior to start-up, the contractor may charge you for the preparation of plans and other working documents.This cost will be deducted from the refund given you by the contractor, and the plans and other documents will be handed over to you. Similarly, the contractor will deduct the cost of any upfront special-order purchases, such as customized windows.
4 — Terms of Payment
Contractors use several methods to determine the cost of a renovation.The all-inclusive stipulated fixed cost is used most commonly. In a cost-plus contract, used primarily in larger projects requiring a higher level of management and administration, the contractor will charge for all expenses incurred in the course of the work (materials, labour, rentals, etc.) plus an additional fee for project management, calculated as a percentage of the total expenses. Or the contractor may suggest billing for the cost plus a fixed fee for management and administration. Discuss with your renovator what approach might be most appropriate for your project.
5 — Payment Schedule
There is no single standard model for payment — the payment schedule depends on the contractor and the work. A clear schedule and an upfront discussion before you sign the contract will help to prevent misunderstandings and conflicts down the road.
It is common practice to pay a deposit upon signing of the contract. The size of the deposit can vary significantly, from 5 to 15 percent of the value of the contract. If your project requires custom-made products, such as windows or doors, the contractor may ask for a non-refundable payment when the products are ordered.
In larger renovations, the contractor may want you to make progress payments at specific milestones, e.g. after pouring the foundation for an addition and again when the frame has been enclosed with exterior walls and a roof. Progress payments enable the contractor to pay subtrades and suppliers for work done early in the project.
Construction lien legislation requires that you hold back a certain percentage of every payment you make, for a certain length of time. This legislation is designed to protect you, the homeowner, in case the contractor does not pay the subtrades and suppliers involved in your project. If not paid, these people have the right to place a lien against your property within a specified length of time (typically 45 to 60 days). Lien legislation is under provincial jurisdiction, and the specific requirements vary from one province to another. You can contact the authorities in your province for more information.
“Completion” can happen in phases. Substantial completion means that the project is ready to use. Final completion means that everything is done, down to the last item. Occasionally, lengthy delays may occur because of late delivery of small items, such as door knobs. You and your contractor can work out a final completion holdback, that allows you to pay the contractor for work already done by him while holding back a reasonable amount for the final details of the work. Weather and a change of seasons may also cause a delay in the completion of the work, and you and your contractor may need to work out a “seasonal holdback”, so that certain work is paid for later if this work can only be completed later.
Holdbacks are often placed in trust with a lawyer until the release date.
6 — Changes in Work
If you change your mind and want to add or delete something to the work, contractors are usually able and willing to accommodate you. Extras are supplementary to the contract, and payment is likewise outside the scope of the original contract.You may have to pay a premium for extras, especially if they disrupt work that has already been done or cause a delay in planned work. If you want to scale the work back, you may have to pay a penalty for the same reasons.The contractor may charge you a percentage of the value of the cancelled work.
7 — Utilities and Washroom Facilities
Most renovation projects require access to water and electricity. The contract should clarify if the contractor can tap into your utilities or has to make alternative arrangements. Heavy-duty equipment may require more power than your home can provide, and the contractor may have to bring a generator on site. Contractors appreciate being able to use your washroom facilities, but you are under no obligation to allow this.
This is also a good time to discuss the logistics of material delivery and storage. Where can suppliers’ trucks pull in to unload? What’s the best place to store materials, as close to the work site as possible and with as little inconvenience to you as possible? Or where to put a bin or container for waste materials?
8 — Standards of Work
Most renovation work entails some degree of disruption and inconvenience to your household, however, the definition of this can be fairly subjective. The best approach is to discuss your concerns and expectations openly with the contractor. What impact will the work have on the household routine? What will the contractor do to minimize it? What level of daily clean-up will they do? What kind of final clean-up can you expect at the end of the project?
9 — Warranty
The contractor should guarantee all workmanship and materials for at least one year after completion of the project. Many products (e.g. windows, furnace, roofing shingles) come with individual manufacturer’s warranties, some extending beyond a one-year period. In the case of defects in these warranted products, the contractor may assume responsibility for dealing with the manufacturers as a matter of professional courtesy; however, it is a good idea to clarify the process with the contractor.
10 — Insurance
The contractor should carry third-party liability insurance, not only to protect your property, home and family, but also adjacent properties as well as neighbours and anyone else who might come onto your property. As a minimum, the contractor should carry $1,000,000 in coverage, and many carry $2,000,000 or more — the larger the renovation project, the greater the coverage needed to ensure full protection in case of accident or injury. It is also a good idea to verify that the contractor is insured against theft of any materials on-site that the contractor is responsible for under the contract, until the materials or products have been installed. Note that the contractor’s insurance will not cover materials provided by you.
To be on the safe side, contact your insurance company before work begins. A small renovation will likely not affect your own homeowner’s insurance. However, a major project may turn your home into a construction site which in turn may affect the conditions of your agreement with the insurance company. If you plan to vacate the house for any time during the renovation, you should tell them. If the renovations add value to your home, you may need to increase your coverage to reflect higher replacement cost of your home.
11 — Compliance with Workers’ Compensation and Other Laws
Workers’ compensation provides insurance for workers in case of workplace injuries. It is legislated provincially under various names (e.g., Workers’ Compensation Act or Workplace Safety and Insurance Act); details of the programs vary from one province to another.
As a homeowner, you need to protect yourself and make sure that you are not liable for injury and/or loss of income, if someone gets hurt while working on your renovation. By law, your contractor must register the company’s employees for workers’ compensation.Your contractor should also verify that any subcontractors working on your project are covered. Ask your contractor for proof of registration; in some provinces, homeowners can request a “letter of clearance” by fax or e-mail directly from the program.
Sole or independent operators, who run their own company, are by definition not “employees”; however, they can still subscribe to workers’ compensation.To protect yourself, you should demand that a sole-operator contractor is either covered by worker’s compensation or by personal disability insurance in case of an accident on your project.
Be aware that if you hire someone who is not covered by workers’ compensation, you could end up being identified as the employer and therefore liable for injuries and/or loss of income.
If you have any questions or concerns, contact the appropriate workers’ compensation program in your province.
12 — Other Contractors
You may want to contract out a specific job (such as bricklaying or electrical) to someone other than the contractor. Some administrative time may be required to coordinate this work with the rest of the work that is being handled by your contractor, and you may be charged for this administration. Bear in mind that work done by others cannot be warranted by the contractor.
You will need to ensure that other contractors hired by you are covered by workers’ compensation and have liability insurance. Also be aware that even having friends and family giving you a helping hand on your renovations entails a potential liability in case of injury. You might want to talk with your insurance company to get a clear under-standing of your position in such circumstances.
13 — Dispute resolution
In spite of a clear, detailed contract, disputes can, and occasionally do, arise for any number of reasons. Good communication can go a long way in settling any disagreements between you and your contractor. As a first step, you should sit down together to discuss the problem calmly and seek a solution that you both can live with comfortably. This is usually the fastest, least expensive and ultimately, most satisfactory approach.
It is a good idea, however, to agree in advance on a process to deal with possible disagreements down the road. Some contracts may provide for the appointment of a third party (or parties) to arbitrate, specifying how third parties are selected and whether their decision would be binding on you and your contractor. Depending on the problem, the arbitrator might be a certified home inspector, an engineer or anyone else with the required expertise and neutrality.
Alternatively, the contract may refer to provincial legislation which provides for a formal arbitration process to help you resolve your dispute.
14 and 15 — Default by Owner or Contractor
The contract should spell out what happens in case of default by either the owner or the contractor. This is a fall-back provision to be used when all else fails; in practice, good communication between you and your contractor, and a willingness to work things out, often make it possible to find alternative approaches.
16 — Signs
This is common practice. Most renovation contractors welcome, and ask for, the opportunity to promote their services to your neighbours and passers-by. If the company does not want to display its sign, it could be an indication that the contractor is avoiding visibility, i.e., is working underground and doesn’t want to run the risk of being caught.
Information that is being provide is for Educational Purpose, Any electric work that is needing to be done, should be done by a Licensed Electrician.
Source: CMHC

Category:
Educational Purpose| No Comments »
August 28th, 2012
Illustration: Ian Warpole
PROBLEM #7
Popular in the 1960s and ’70s, unsafe aluminum wiring is a cheap substitue for copper
ALUMINUM WIRING
What it means: You have a type of wiring, used in the 1960s and ’70s as a cheap substitute for copper, that is no longer considered safe.
Code violation? No; grandfathered in.
Danger level: High. Aluminum corrodes when in contact with copper, so connections loosen, which can lead to arcing and fires.
Solution: Retrofit a dielectric wire nut approved for aluminum wire (a pair sells for less than $1) onto each copper/aluminum connection in light fixtures. These nuts have a special grease that stops corrosion while maintaining conductivity. Make sure any replacement switches and receptacles are labeled AL-compatible.
Source : This Old House
Information that is being provide is for Educational Purpose, Any electric work that is needing to be done, should be done by a Licensed Electrician.
Category:
Educational Purpose| No Comments »
August 28th, 2012
Before You Start Renovating Your Kitchen
Your kitchen is probably the most used room in your house. Poor layout, inadequate lighting, cramped spaces, outdated fixtures and old cabinetry are common complaints of homeowners.
Before you decide to go ahead with a kitchen renovation, it is important to clearly identify the features you want in your new kitchen. Just as important is a thorough pre-renovation inspection to identify any existing problems.

Common Situations
Kitchen renovations are high on the list of the most common home renovations. A renovation can be as simple as installing new flooring or be a major undertaking that includes enlarging the space and replacing all fixtures and finishes.
Homeowners consider kitchen renovations for many reasons including:
- Size and design — the existing kitchen may be too small or poorly laid out.
- Fixtures and appliances — the fixtures and appliances may be worn out, inefficient or outdated.
- Cabinets and countertops — cabinet finishes, hardware or countertops may be outdated, need repair or replacement.
- Structural problems — there may be problems that require structural changes or repairs.
- Moisture — the floor, walls or finishes may be unsightly or damaged due to moisture problems.
- Plumbing and electrical — many older kitchens don’t have enough electrical outlets and circuits. Older plumbing and plumbing fixtures may include lead or galvanized steel piping.
- Heating and ventilation — older kitchens often have inadequate ventilation or heating systems. The area may be poorly insulated and have a high degree of air leakage, two factors that lead to high energy consumption.
- Finishes — older finishes may be unattractive or not durable enough to withstand the daily wear and tear.
Healthy HousingTM
Renovating is an ideal time to make your house healthier for you, the community and the environment. When planning your kitchen renovations, be sure to consider the five essentials of Healthy HousingTM.
House as a System
A house is much more than just four walls and a roof — it’s an interactive system made up of many components including the basic structure, heating, ventilation and air conditioning (HVAC) equipment, the external environment and the occupants. Each component influences the performance of the entire system. A renovation provides an opportunity to improve how your house performs. Kitchen renovations often include changes to HVAC equipment that can improve indoor air quality and moisture management in the house. Be careful if choosing large volume exhaust fans because they can cause combustion heating equipment to backdraft. Structural changes may give you a chance to improve air tightness and insulation, resulting in increased occupant comfort and house durability.
Avoid Surprises
Once you start a renovation, there’s no turning back. Your life is disrupted and any unexpected problems will lead to higher costs and delays in finishing the project. Thorough planning will help you to develop a realistic understanding of the work to be done and the costs involved. Here are some of the likely situations that people encounter. However, every situation is unique and you may need to hire a qualified professional to do a thorough investigation, find the problems and suggest the best solutions.
Size and design |
 |
- How much workspace do you need? Is an eating area in the kitchen important?
- What are the traffic patterns?
- Is there adequate storage space?
- Does the kitchen meet the needs of everyone in the household including anyone with special needs, extended family and guests?
|
 |
- Plan thoroughly before you start. Sometimes a simple reorganization of the space will solve many of the shortcomings of older kitchens.
- Consider an addition or adding space from adjoining areas to meet your space and function requirements.
- Use a professional designer to help you design a plan to best meet your existing and future needs.
|
 |
- You will have to live with the results even if they don’t meet your needs.
- A poor layout will seriously detract from your enjoyment of the renovation.
- The layout may not be flexible enough to meet existing or future demands for space, storage and anyone with special needs such as wheelchair accessibility.
|
Fixtures and appliances |
 |
- Do the existing fixtures and appliances have years of useful life left?
- Do you like the style and features of your appliances? Are they energy-efficient?
- Is there adequate general and task lighting?
|
 |
- Replace or repair worn out appliances or fixtures.
- Familiarize yourself with available products and options.
- Choose efficient fixtures that will reduce water and electricity consumption. New kitchen appliances carry an EnerGuide label identifying their energy efficiency rating.
- Update lighting so that it provides the brightness that you need. Compact fluorescent light fixtures are four times more efficient than standard incandescent bulbs.
|
 |
- Old fixtures may have to be replaced later and the new fixtures may not fit into the spaces allowed. This may involve further modification of cabinets or room layout.
- If you don’t do your homework, you may find more appropriate, appealing appliances or fixtures after you have completed the work.
- Outdated appliances and lighting usually mean higher ongoing energy costs.
|
Cabinets and countertops |
 |
- Are existing cabinets or countertops damaged? Do you like the style of the cabinets and countertops?
- Is there enough storage and workspace?
|
 |
- Replace or repair damaged or outdated cabinets or countertops.
- Install additional cabinets or countertops to meet your work needs. Consult with a kitchen planner to organize storage and workspace more efficiently.
|
 |
- Damaged, hard-to-clean countertops can harbour bacteria. The kitchen may be less functional and an unappealing work and living space.
|
Structural problems |
 |
- Are there any existing structural deficiencies in this area or nearby areas of the house?
- Do any structural walls or lintels need to be removed?
- Will installation of new windows or doors require special structural details?
- Are the walls, ceiling, floor or basement areas well-insulated and air-sealed to provide a comfortable energy-efficient space?
|
 |
- Carry out a complete inspection. You may want to hire an expert.
- Repair, strengthen or replace structural components so they can carry the new loads.
- Insulate and air-seal the building to provide warm interior surfaces and a draft-free living space.
- Remove wall coverings, when possible, to properly insulate and install a sealed air and vapour barrier. The open wall cavities will also make it easier to install new wiring, plumbing and other services.
|
 |
- Structural deficiencies can lead to cracked finishes, floor vibration, bowing or displacement of walls, floors or roof structures and possible structural failure.
- Exterior walls that are poorly insulated and not air-sealed will lead to continued high energy costs, possible condensation problems and discomfort in the living space.
|
Moisture |
 |
- Do any of the finishes have moisture damage?
- Is there visible mold growth on any surfaces? Are there any water stains?
- Is there blistered or peeled paint?
- Is any of the caulking or grout cracked or missing?
- Has there been condensation on windows, wall or ceiling surfaces?
|
 |
- Determine the source of the moisture. It may be from building or plumbing leaks or from condensation of humidity on cold surfaces.
- Clean up visible mold growth according to CMHC guidelines.
- Insulate, air-seal and use energy-efficient windows to provide warmer inside surface temperatures.
- Repair or replace all deteriorated finishes or structural components.
- Maintain caulking, grout and flashings to prevent water access to the building structure.
- Minimize moisture sources and ventilate to control high humidity.
|
 |
- Unsolved water damage problems will continue and lead to further deterioration of the building or newly renovated areas.
- Mold growth caused by excess moisture can be a serious source of IAQ problems.
- Superficial cleanup or hiding of moisture damage behind new finishes will allow deterioration to continue.
|
Plumbing and electrical |
 |
- Is the electrical service adequate for the number of outlets and circuits required and for future expectations?
- Does the existing plumbing service work well? Is there adequate water pressure? Do the drains flow quickly?
- Are there any leaks or evidence of water damage?
- If the house is pre-1950, are there any lead or galvanized steel water pipes?
|
 |
- Have a professional electrician assess the electrical service and your needs. Upgrade and repair the electrical service and wiring as required.
- Repair any plumbing leaks and upgrade the existing service as required.
- Equip outlets near the sink with ground fault circuit interrupters to prevent shocks.
- Replace any lead or corroded metal water pipes.
|
 |
- An undersized electrical service can lead to circuit overloads and the constant jockeying of countertop appliances.
- Inadequate or leaky plumbing will cause ongoing inconvenience. Leaks can lead to mold growth and IAQ problems.
- Even minor leaks around plumbing joints, gaskets and sinks will damage new materials.
- Lead piping and corroded metals can contaminate water.
|
Heating and ventilation |
 |
- Is the room comfortable and easy to heat?
- Does excess condensation form on windows or other surfaces?
- Is there an exhaust fan that is ducted to the outside?
- Is the air fresh and clean? Are there lingering musty smells?
- Would a large exhaust fan lead to backdrafting of an oil or wood stove, furnace or water heater?
|
 |
- Make sure that there is adequate heating to the area. Poor insulation levels and high air leakage will make the area hard to heat, drafty and uncomfortable.
- Install an exhaust fan with adequate airflow capacity, 50 L/s (105 cubic feet per minute minimum). The fan should be quiet with a sound rating of 3.5 sones or less and be vented to the outside. Choose ventilation appliances that are certified by HVI (Heating and Ventilating Institute).
- Install a whole house ventilation system if possible. Consider one that includes heat recovery.
- Use a licensed installer for heating and ventilation work.
|
 |
- The heating system may not be able to maintain a comfortable temperature in the living space during cold, windy weather.
- You may experience lingering odours and excess humidity in the house.
- Large volume exhaust fans can cause backdrafting (smells, smoke or toxic gases escaping into the house) of combustion equipment such as fuel burning fireplaces, furnaces, wood stoves and water heaters that use oil, natural gas or propane. A trained technician can remedy or avoid this health and safety problem.
|
Finishes |
 |
- What is the condition of current finishes? Do they need to be replaced because of wear or styling?
- What finishes will be durable enough for the intended use, for example countertops, floor covering and wall finishes?
- Are the planned materials and finishes low odour and low in chemical emissions such as volatile organic compounds (VOCs)?
- What preparation is required for the new finishes? Are special skills needed to install the finishes?
|
 |
- Decide what finishes need to be repaired or replaced. Do your research. There are many new and different products on the market. Vinyl, ceramic and hardwood flooring all have different installation requirements.
- Choose products that are designed to meet specific needs e.g., water resistance, durability or cleaning.
- Choose low odour materials, finishes and adhesives to minimize effects on Indoor Air Quality (IAQ).
- Use a qualified installer for products that require special installation conditions or skills.
|
 |
- Improper installation of finishes will void the warranty and may provide unattractive results.
- Cracked ceramic tile or grout are common problems resulting from inadequate subfloor strength and stiffness.
- Hardwood flooring can shrink or swell if it is not allowed time to condition to the humidity of the space before installation or if it is not sealed properly.
- Potentially harmful emissions from new materials can linger for long periods within the house.
|
Rewards
- Repairing structural problems, fixing leaks and making sure that all services are adequate will prolong the life of your house and make the renovation look and work better.
- By using low odour and easy to clean finishes, you will improve the IAQ of your home. Reducing condensation and controlling humidity will help to prevent mold growth.
- Thorough planning will result in a warm, comfortable, useable kitchen with good lighting and plenty of work and storage space.
- A well thought out and executed renovation will increase the value of your house.
|
Skills to Do the Job
A homeowner with good fix-it skills may be able to do some of the work on the renovation such as:
- Removing old fixtures and finishes.
- Caulking or repairing roof and window leaks.
- Installing insulation.
- Air-sealing the building.
- Painting.
Consider a professional renovator for structural changes, finish work or to undertake the complete project management. If you are doing it yourself, you will still need to hire subcontractors to carry out the electrical, plumbing, heating and ventilation work. Depending on the nature of the project, you may also need to hire other tradespeople to do roofing, window and door installation, install cabinets and flooring or paint and do drywall finishing. Remember to obtain all necessary permits, sign a written contract, ensure that workers use safe working practices, have professional licenses where required and are covered by workers’ compensation. Protect yourself, your family and your home. |
Use the Kitchen Assessment Worksheet to record the present condition, any problems and to estimate costs for your kitchen renovation.
Kitchen Assessment Worksheet |
Room Dimensions |
|
|
|
|
Present Condition/Problems |
Options or Upgrades |
Cost |
Ceiling and Finishes |
|
|
|
Walls and Finishes |
|
|
|
Floor and Finishes |
|
|
|
Room Lighting |
|
|
|
Task Lighting |
|
|
|
Windows |
|
|
|
Doors |
|
|
|
Cabinets, Countertops and Hardware |
|
|
|
Sink and Faucets |
|
|
|
Appliances |
|
|
|
Plumbing |
|
|
|
Electrical Services |
|
|
|
Heating |
|
|
|
Ventilation |
|
|
|
Other |
|
|
|
Costing Your Project
The cost of the renovation work will depend on the condition of the existing structure, the extent of the work to be done and local labour and material prices. Costs of finishes and fixtures vary widely. A good budget checklist will help you to develop a realistic cost for the project before you start. Some of the items to include are:
Category:
Educational Purpose| No Comments »
|
|
|
|